Reclaim Water Pumping Station Pump Replacements
Sector: Wind • Location: New Smyrna Beach, Florida, United States of America
Source: Dodge USA
Work set forth in the Contract Documents and generally described as follows: 1. Replacement of Reclaimed Pumps #2 and #3 with 125 Hp Trillium Vertical Turbine Pumps and Motors, corresponding electrical improvements, upsizing of ductile iron discharge pipe from 10 to 12 , installation of pipe restraints, pipe supports, construction of reuse pump station bypass system, and replacement of effluent tr
- Status
- Closed
- Sector
- Wind, Metal, Water Supply and Storage, Power Generation (CCGT), Government, Steel, Commercial, Waste Processing and Treatment
- Location
- New Smyrna Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reclaim Water Pumping Station Pump Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work set forth in the Contract Documents and generally described as follows: 1. Replacement of Reclaimed Pumps #2 and #3 with 125 Hp Trillium Vertical Turbine Pumps and Motors, corresponding electrical improvements, upsizing of ductile iron discharge pipe from 10 to 12 , installation of pipe restraints, pipe supports, construction of reuse pump station bypass system, and replacement of effluent transfer slide gate seals with bulb seal and retainer (Part No. SRP088) and neoprene invert seal (P... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | New Smyrna Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Metal, Water Supply and Storage, Power Generation (CCGT), Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
