Reclaimed Water Distribution Line
Sector: Waste Processing and Treatment • Location: Houston, Texas, United States of America
Source: Dodge
Approximately 11,000LF of 6 through 10 C900 PVC reclaimed water main using both open cut and trenchless methods All related gate valves, air release valves, blow off valves, service connections, and water main testing Implementation of Storm Water Pollution Prevention measures, tree protection, and required site restoration
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Reclaimed Water Distribution Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximately 11,000LF of 6 through 10 C900 PVC reclaimed water main using both open cut and trenchless methods All related gate valves, air release valves, blow off valves, service connections, and water main testing Implementation of Storm Water Pollution Prevention measures, tree protection, and required site restoration |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
