Reclaimed Water Distribution Line
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
Approximately 11,000LF of 6 through 10 C900 PVC reclaimed water main using both open cut and trenchless methods All related gate valves, air release valves, blow off valves, service connections, and water main testing Implementation of Storm Water Pollution Prevention measures, tree protection, and required site restoration
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Reclaimed Water Distribution Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximately 11,000LF of 6 through 10 C900 PVC reclaimed water main using both open cut and trenchless methods All related gate valves, air release valves, blow off valves, service connections, and water main testing Implementation of Storm Water Pollution Prevention measures, tree protection, and required site restoration |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
