Reclaimed Water Distribution System
Sector: Water Supply and Storage • Location: Cheney, Washington, United States of America
Source: Dodge USA
This work is for the installation of a reclaimed water transmission pipeline and fiber optic cable, valve vaults, pipe fittings and valves, and field instrumentation and controls. The work is to be performed between November 2024 and January 2026.
- Status
- Closed
- Sector
- Water Supply and Storage, Telecommunications, Government, Commercial, Broadband, Waste Processing and Treatment
- Location
- Cheney, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reclaimed Water Distribution System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work is for the installation of a reclaimed water transmission pipeline and fiber optic cable, valve vaults, pipe fittings and valves, and field instrumentation and controls. The work is to be performed between November 2024 and January 2026. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Cheney |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Telecommunications, Government, Commercial, Broadband, Waste Processing and Treatment |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
