Reconnecting Pasadena Master Plan
Sector: Road • Location: Pasadena, California, United States
Source: Urban Land Magazine
A master plan to transform Pasadena's historic downtown by decoupling the stub end of the State Route 710 freeway from regional circulation and reconnecting this strip to the local street grid. The plan includes adding new bikeways, greenways, paseos, and urban gardens to repair the city's divided urban fabric and set the stage for a new era of development.
- Status
- Prospective
- Sector
- Road, Government
- Location
- Pasadena, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Urban Land Magazine
ConstructChat
Ask ConstructChat about Reconnecting Pasadena Master Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A master plan to transform Pasadena's historic downtown by decoupling the stub end of the State Route 710 freeway from regional circulation and reconnecting this strip to the local street grid. The plan includes adding new bikeways, greenways, paseos, and urban gardens to repair the city's divided urban fabric and set the stage for a new era of development. |
Original sector | Urban Development |
Location
Country | United States of America (USA) |
State | California |
City | Pasadena |
Source
Source | Urban Land Magazine |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
