Reconnection to the Central Asian Power System Project - Additional Financing
The status, timeline and source of this project. A free account opens every field.
Source: Asian Development Bank (ADB)
The proposed additional financing will be allocated to finance additional components (i) the construction of 22 kilometers of new 500 kilovolt transmission lines between Syrdarya (Uzbekistan) and Sughd (Tajikistan) substations, including rerouting of existing transmission lines; and (ii) the construction of two new line bays at both substations and related works in open switchgears; (iii) capacity
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Rail, Raw Materials, Residential, Power Generation (CCGT), Commercial, Government, Education
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Reconnection to the Central Asian Power System Project - Additional Financing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed additional financing will be allocated to finance additional components (i) the construction of 22 kilometers of new 500 kilovolt transmission lines between Syrdarya (Uzbekistan) and Sughd (Tajikistan) substations, including rerouting of existing transmission lines; and (ii) the construction of two new line bays at both substations and related works in open switchgears; (iii) capacity building for both countries technical staff, including female students from local technical colleges and universities in Tajikistan. |
Original sector | Energy |
Budget |
Location
Country | Tajikistan |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Rail, Raw Materials, Residential, Power Generation (CCGT), Commercial, Government, Education |
Article published date | 2024-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tajikistan
- Sangtuda 2 Hydropower Plant
- PamirEnergy
- Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches
- Enhancing Sustainability: Financing for the Rogun Hydropower Project
- Yavan Water
- Tajikistan: Nurek Hydropower Rehabilitation, Phase I
- Water Resources Management in Pyanj River Basin Project
- Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
