Reconstruct Walnut St S 5th St 1st Ave. South
Sector: Cement • Location: Grand Forks, North Dakota, United States of America
Source: Dodge USA
2220 SY Remove Concrete Pavement, 2178 SF Remove Driveway, 2395 SF Remove Sidewalk, 5 EA Remove Catch Basin, 124 LF Remove Existing Pipe, 890 CY Common Excavation, 614 CY Granular Material for Base, 1486 SY Concrete Pavement (6 ), 1909 SY Geotextile Fabric, 175 LF of 12 & 15 RCP Class lll, 4 LF 48 Manhole, 20 LF 30 Standard Catch Basin, 160 LF 4 PVC Underdrain with Sock, 2008 SF 4 Concrete Sidewal
- Status
- Closed
- Sector
- Cement, Manufacturing (Industrial), Road, Car parking, Automotive, Government, Commercial
- Location
- Grand Forks, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reconstruct Walnut St S 5th St 1st Ave. South
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2220 SY Remove Concrete Pavement, 2178 SF Remove Driveway, 2395 SF Remove Sidewalk, 5 EA Remove Catch Basin, 124 LF Remove Existing Pipe, 890 CY Common Excavation, 614 CY Granular Material for Base, 1486 SY Concrete Pavement (6 ), 1909 SY Geotextile Fabric, 175 LF of 12 & 15 RCP Class lll, 4 LF 48 Manhole, 20 LF 30 Standard Catch Basin, 160 LF 4 PVC Underdrain with Sock, 2008 SF 4 Concrete Sidewalk, 2349 6 Reinforced Driveway, 1 EA Remove & Reset Street Light, and Other Miscellaneous Work Items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Grand Forks |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Manufacturing (Industrial), Road, Car parking, Automotive, Government, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
