logo

Reconstruction aid water and sanitation Gaza

Sector: Automotive • Location: Palestinian territories

Source: KFW Bank aus Verantwortung

Project
Completed

The aim of the FC measure is to restore the supply of drinking water to the population and to restore sanitation in the Gaza Strip. In addition, the legitimacy of the Palestinian Authority (PA) and the operator Costal Municipalities Water Utility (CMWU) in the Gaza Strip is to be increased. The proposed measures include the repair and reconstruction of the water supply and sanitation systems as a

Project Information FAQ

Project Information

5 Q
The project “Reconstruction aid water and sanitation Gaza” is an infrastructure initiative in the Automotive sector, located in Palestinian territories. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The aim of the FC measure is to restore the supply of drinking water to the population and to restore sanitation in the Gaza Strip. In addition, the legitimacy of the Palestinian Authority (PA) and the operator Costal Municipalities Water Utility (CMWU) in the Gaza Strip is to be increased. The proposed measures include the repair and reconstruction of the water supply and sanitation systems as a result of the recent fighting in order to improve the acute supply emergency of the population and the precarious health and environmental situation. The target group of the measures is the entire population of the Gaza Strip of around 1.8 million people, who will benefit from the positive health and environmental effects of the emergency measures. The measures include clean-up work and the reconstruction of the water and wastewater infrastructure across the entire supply and disposal chain, i.e. wells, desalination, transport, processing, storage, distribution, house connections, collection, treatment, disposal, etc. In addition, the associated transport and energy infrastructure, equipment, vehicles, buildings as well as operating costs for personnel, fuel, electricity, chemicals and spare parts are to be financed. Environmental damage caused by spilled fuel, wastewater and chemicals is also to be remedied. Due to the unclear further development and extent of damage, the financing of emergency aid measures is not ruled out. Any remaining funds are to be used to finance the expansion of the (waste) water infrastructure. The total damage and expansion measures in the water and wastewater sector in Gaza amount to up to EUR 530 million. The measure is to be provided with an initial FC contribution of EUR 9 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data