logo

Reconstruction Darfur

Sector: Water Supply and Storage • Location: Sudan

Source: KFW Bank aus Verantwortung

Project
Active

The aim of the FC measure in South Darfur is to strengthen the economic situation and living conditions of households in the project region and to increase the resilience of the target group by diversifying sources of income, improving the infrastructure for livestock and agriculture and creating short-term employment opportunities. The aim is to strengthen peaceful coexistence between local commu

Project Information FAQ

Project Information

5 Q
The project “Reconstruction Darfur” is an infrastructure initiative in the Water Supply and Storage sector, located in Sudan. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The aim of the FC measure in South Darfur is to strengthen the economic situation and living conditions of households in the project region and to increase the resilience of the target group by diversifying sources of income, improving the infrastructure for livestock and agriculture and creating short-term employment opportunities. The aim is to strengthen peaceful coexistence between local communities, returning internally displaced persons and pastoral and agricultural population groups. In the medium term, this should reduce the effects of the ongoing conflict and lay the foundation for stable development. The international non-governmental organization (NGO) World Vision Germany is the sponsor of the project and is cooperating with World Vision Sudan in the project implementation. The project duration is 5 years. The measures include community infrastructure and training in the areas of productive rural infrastructure with a particular focus on the development of agricultural irrigation systems, value chains for agricultural products and improved transport routes (including feeder roads and bridges). The total cost of the project is EUR 11 million, of which EUR 10 million will be financed from FC funds. The NGO World Vision Germany will make its own contribution of EUR 1 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data