Reconstruction of Ahrtalbahn Section Destroyed by 2021 Flooding
Sector: Bridge • Location: Germany
Source: RailTech
Deutsche Bahn (DB) is rebuilding the last destroyed section of the Ahrtalbahn from scratch, two years after it was destroyed by flooding in 2021. The reconstruction includes replacing bridges, laying new rails and sleepers, redesigning infrastructure to be more resistant to extreme weather, repairing level crossings and signal boxes, and renewing affected stations.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Deutsche Bahn (DB) is rebuilding the last destroyed section of the Ahrtalbahn from scratch, two years after it was destroyed by flooding in 2021. The reconstruction includes replacing bridges, laying new rails and sleepers, redesigning infrastructure to be more resistant to extreme weather, repairing level crossings and signal boxes, and renewing affected stations. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
