Reconstruction of Jiangyan South Roundabout

Sector: Airport • Location: Jiangsu, China

Source: World Bank Group

Project
Active

The project construction content includes expressway system (reconstruction of National Highway 328 and reconstruction of Pohu Avenue) and supporting transportation complex. The reconstruction route of National Highway 328 is 6.65 kilometers long, and the reconstruction route of Lihu Avenue is 1.94 kilometers long. There are a total of 2 main line viaducts, 8 upper and lower ramp bridges, 4 ground

Project Information FAQ

Project Information

5 Q
The project “Reconstruction of Jiangyan South Roundabout” is an infrastructure initiative in the Airport sector, located in Jiangsu, China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project construction content includes expressway system (reconstruction of National Highway 328 and reconstruction of Pohu Avenue) and supporting transportation complex. The reconstruction route of National Highway 328 is 6.65 kilometers long, and the reconstruction route of Lihu Avenue is 1.94 kilometers long. There are a total of 2 main line viaducts, 8 upper and lower ramp bridges, 4 ground bridges, and 1 interchange at the hub. The main line viaduct in the south ring city is about 5.82km, and the main line viaduct in the Pohu Avenue is about 1.22km. The main road of the project adopts the two-way six-lane urban expressway and first-class highway standard with a design speed of 80km / h; the auxiliary road adopts the two-way six-lane urban trunk road standard with a design speed of 50km / h; the design of the interchange ramp is 40km / h. SPV is CCCC Second Airlines Jiangsu Construction Development Co., Ltd. Total investment stands at $ 372.12 million. No additional financial information is available. Concession period is 20 years. Financial close took place on December 13, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=14da7bdfa34445508424028526b399f9

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data