Reconstruction of Jiangyan South Roundabout
Sector: Airport • Location: China
Source: World Bank Group
The project construction content includes expressway system (reconstruction of National Highway 328 and reconstruction of Pohu Avenue) and supporting transportation complex. The reconstruction route of National Highway 328 is 6.65 kilometers long, and the reconstruction route of Lihu Avenue is 1.94 kilometers long. There are a total of 2 main line viaducts, 8 upper and lower ramp bridges, 4 ground
- Status
- Prospective
- Sector
- Airport, Road, Bridge, Government, Manufacturing (Industrial), Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Reconstruction of Jiangyan South Roundabout
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project construction content includes expressway system (reconstruction of National Highway 328 and reconstruction of Pohu Avenue) and supporting transportation complex. The reconstruction route of National Highway 328 is 6.65 kilometers long, and the reconstruction route of Lihu Avenue is 1.94 kilometers long. There are a total of 2 main line viaducts, 8 upper and lower ramp bridges, 4 ground bridges, and 1 interchange at the hub. The main line viaduct in the south ring city is about 5.82km, and the main line viaduct in the Pohu Avenue is about 1.22km. The main road of the project adopts the two-way six-lane urban expressway and first-class highway standard with a design speed of 80km / h; the auxiliary road adopts the two-way six-lane urban trunk road standard with a design speed of 50km / h; the design of the interchange ramp is 40km / h. SPV is CCCC Second Airlines Jiangsu Construction Development Co., Ltd. Total investment stands at $ 372.12 million. No additional financial information is available. Concession period is 20 years. Financial close took place on December 13, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=14da7bdfa34445508424028526b399f9 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Airport, Road, Bridge, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in China
- Beilungang CoalFired
- Zhuhai airport concession
- Dabie Mountain General Aviation Airport
- Chengdu Tianfu International Airport New City Road Project
- Hainan Meilan Airport
- Qingzhou Min River Bridge & Airport Highway
- Guilin City - Liang Jiang Airport Toll Road
- Chengdu Tianfu International Airport New City Tunxi South and North City Road Project
