Reconstruction of Streetcar Overhead
Sector: Cable car • Location: Ontario, Canada
Source: Infrastructure Canada
Upgrades to the existing Overhead Contact System (OCS) on revenue service routes, as well as the three legacy yards, are part of the scope of this project. These upgrades are driven by the planned replacement of the existing streetcars with new Low Floor Light Rail Vehicles (LFLRV). This project is scheduled to reconstruct 10 intersections per year, replace 20 Km of tangent trolley wire per year a
- Status
- Closed
- Sector
- Cable car, Rail, Automotive, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Reconstruction of Streetcar Overhead
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upgrades to the existing Overhead Contact System (OCS) on revenue service routes, as well as the three legacy yards, are part of the scope of this project. These upgrades are driven by the planned replacement of the existing streetcars with new Low Floor Light Rail Vehicles (LFLRV). This project is scheduled to reconstruct 10 intersections per year, replace 20 Km of tangent trolley wire per year and reconstruct portions of Roncesvalles yard. |
Original sector | Public Transit |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Cable car, Rail, Automotive, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
