Reconstruction of the City’s main sewage pumping station

In progress · Ontario

Source: Infrastructure Canada

Project
In Progress

The City of Brockville proposes to replace an existing sanitary sewer pumping station with a new one. The existing pumping station was constructed in 1962 and upgraded in 1993. It conveys over 90% of the City’s wastewater flow to the City’s water pollution control center for processing. The station has a rated capacity of 33,000 m3/day and on average pumps 16,500 m3/day. A Schedule B Municipal Cla

Status
Under Construction
Sector
Water Supply and Storage, Government, Waste Processing and Treatment
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Reconstruction of the City’s main sewage pumping station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Reconstruction of the City’s main sewage pumping station” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Brockville proposes to replace an existing sanitary sewer pumping station with a new one. The existing pumping station was constructed in 1962 and upgraded in 1993. It conveys over 90% of the City’s wastewater flow to the City’s water pollution control center for processing. The station has a rated capacity of 33,000 m3/day and on average pumps 16,500 m3/day. A Schedule B Municipal Class Environmental Assessment (EA) of the pumping station and associated forcemain was completed in 2012 to address current and potential future environmental, technical and operational concerns. The EA identified the following operational issues with the pumping station. 1. The new wet well will be designed and built to accommodate periodic inspections, maintenance and cleaning without having to by-pass untreated sewage to the St. Lawrence River as happens now. 2. The new mechanical bar screen will be fully automated where screened material will be collected in the appropriate bins rather than accumulating on the floor of the facility and manually placed in garbage bins for disposal, thereby improving the health and safety of the operations staff. 3. The new wet well will be designed and built such that its size and configuration along with the positioning of the pumps will no longer cause cavitation of Pumps 1 and 2, thereby ensuring the City is maximizing the life span of the pumps. 4. The new pump station will be designed and built with an air filtration system. This will ensure that the users of the adjacent City park are not subjected to foul odour as they are currently during the summer months. 5. The new station will have new valves, pumps and other pieces of equipment that can be replaced without by-passing raw sewage to the river.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project