Reconstruction of the Erlangen lock
Sector: Commercial • Location: Germany
Source: Keep.EU
NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The lock Erlangen was put into operation at the beginning of the 1970s. Soon afterwards the first damages were discovered and first constructional rehabilitation measures were necessary in.
OBJECTIVE(S) OF THE PROJECT: Building of the replacement construction.
The new lock will be built 300m north of the existing weir and lock. The lock
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The lock Erlangen was put into operation at the beginning of the 1970s. Soon afterwards the first damages were discovered and first constructional rehabilitation measures were necessary in. 1974. OBJECTIVE(S) OF THE PROJECT: Building of the replacement construction. The new lock will be built 300m north of the existing weir and lock. The lock chamber will have the same dimensions in lenght as the old lock (190m), while the width will be enhanced by 50cm to. 12.5m. As soon as the new lock has been put into operation, the existing lock will be shut down and partially dismantled. CONDUCTED AND PLANNED PROJECT ACTIVITIES: The project will be implemented in 8 building phases, including the dismantling of the old lock. 2018: planning approval. 2020 – 2025: construction works. 2026: operation of new lock. 2028 – 2030: deconstruction of the old lock. TRANSBOUNDARY IMPACT: Since it is not possible to bypass the lock, its reconstruction is crucial for navigation along the entire Rhine-Main-Danube axis. PROJECT BENEFICIARIES / TARGET GROUPS: waterway users. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
