Reconstruction of the Kriegenbrunn lock

Sector: Commercial • Location: Germany

Source: Keep.EU

Project
Closed

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The lock Kriegenbrunn was put into operation in.

  1. Soon afterwards the first damages were discovered and first constructional rehabilitation measures were necessary in.

  2. Until 2008, altogether five rehabilitation measures were needed in order to maintain the functionality of the lock, but the problems were not solved entirely.

OBJECT

Project Information FAQ

Project Information

5 Q
The project “Reconstruction of the Kriegenbrunn lock” is an infrastructure initiative in the Commercial sector, located in Germany. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The lock Kriegenbrunn was put into operation in. 1972. Soon afterwards the first damages were discovered and first constructional rehabilitation measures were necessary in. 1974. Until 2008, altogether five rehabilitation measures were needed in order to maintain the functionality of the lock, but the problems were not solved entirely. OBJECTIVE(S) OF THE PROJECT: Building of the replacement construction. The new lock will be built 45m downstream of the existing weir and lock. The lock chamber will have the same dimensions in lenght as the old lock (190m), while the width will be enhanced by 50cm to. 12.5m. As soon as the new lock has been put into operation, the existing lock will be shut down and partially dismantled. CONDUCTED AND PLANNED PROJECT ACTIVITIES: The project will be implemented in 10 building phases, including the dismantling of the old lock. 2017: planning approval. 2019 – 2024: construction works. 2025: operation of the new lock. 2027 – 2029: deconstruction of the old lock. TRANSBOUNDARY IMPACT: Since it is not possible to bypass the lock, its reconstruction is crucial for navigation along the entire Rhine-Main-Danube axis. PROJECT BENEFICIARIES / TARGET GROUPS: waterway users.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data