Reconstruction section(Jixian County to Jiangyouhekou) of S209
Sector: Road • Location: China
Source: World Bank Group
The project involves 35.255km of road reconstruction of provincial highway S209 Jiangyouhekou to Qixian County. The construction standard is highway secondary, asphalt concrete pavement, subgrade width 10~15m, design speed 40km/h; 11 bridge and culvert projects involved, including demolition and reconstruction 7 seats, 2 bridges are used for widening, 2 new bridges are built, and culverts are main
- Status
- Prospective
- Sector
- Road, Cement, Bridge, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Reconstruction section(Jixian County to Jiangyouhekou) of S209
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves 35.255km of road reconstruction of provincial highway S209 Jiangyouhekou to Qixian County. The construction standard is highway secondary, asphalt concrete pavement, subgrade width 10~15m, design speed 40km/h; 11 bridge and culvert projects involved, including demolition and reconstruction 7 seats, 2 bridges are used for widening, 2 new bridges are built, and culverts are mainly reinforced concrete pipe culverts. Reinforced concrete pipe culverts total 2492 meters / 55 roads, reinforced concrete cover culverts total 1244 meters / 92 roads. It involves 35,255m traffic engineering, including 212 traffic signs, 10576m roadside wave barriers, 35 kilometers, 353 hundred-meter piles, and 353 boundary pillars. SPV is Mianyang Road Tongyuan Construction Co., Ltd. a JV between the sponsors Mianyang Road and Bridge Construction Co., Ltd. (95%) and the state-owned Jixian Juyuan Asset Management Investment Co., Ltd. (5%). Type of concession is BOT with a contract period of 15 years. Financial close took place on February 19, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=2ad3075d5d6b4aebaf6dd1b3b879f71d |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Bridge, Government, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in China
- Beilungang CoalFired
- Wensu County Rural Roads Construction Project
- Huaxi section, part of the southern section of Huaguan Road
- Dongming County Highway
- Ji'an City urbanization project
- Wenzhou Oujiang Belt Expressway to Woqi Section and Oujiang Road East Extension
- Roadway No. 321 (Wuzhou Section)
- Shen-Shan Highway (Eastern Section)
