RECONSTRUCTION
One of 2,100 projects Taiyo tracks in Iraq.
Source: World Bank Group
Part of a long-range program to expand and improve the Grain Board's handling and storage system to increase the Grain Board's share of the domestic grain trade with the aim of increasing producer and lowering consumer prices. The total storage capacity provided by the project facilities would be 560,000 tons and would be provided through: A. (a) the construction and equipping of eleven terminal s
- Status
- Closed
- Sector
- Raw Materials, Government
- Location
- Iraq
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RECONSTRUCTION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Part of a long-range program to expand and improve the Grain Board's handling and storage system to increase the Grain Board's share of the domestic grain trade with the aim of increasing producer and lowering consumer prices. The total storage capacity provided by the project facilities would be 560,000 tons and would be provided through: A. (a) the construction and equipping of eleven terminal silos, with a total capacity of about 468,000 tons; (b) the construction and equipping of three gathering silos, with a total capacity of 36,000 tons; (c) the construction and equipping of four silos expansions, with a total capacity of 36,000 tons; (d) the construction and equipping of a 20,000-ton transfer terminal silo at the port of Um Qasr. B. Provision of consulting services to: (i) assist in the design and construction supervision of the silos; (ii) provide technical assistance and equipment necessary to build mechanized inventory control and communications system; and (iii) undertake a comprehensive study on grain pricing and marketing. C. Provision for training for those who would manage and operate the new silo facilities. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Iraq |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Iraq
- BBAC Iraq Central Bank Mandatory Reserves Coverage
- First Package of Irrigation and Water Projects
- Gulftainer II
- Sama Al Manar Tiryaki Iraq
- Common Seawater Supply Project (CSSP)
- Iraq Common Seawater Supply Project (CSSP)
- IQ-EMERGENCY COMMUNITY INFRASTRUCTURE REHAB ADDITIONAL FINANCING
- Irrigation and Drainage Improvement Project
