logo

RECONSTRUCTION

Sector: Raw Materials • Location: Iraq

Source: World Bank Group

Project
Closed

Part of a long-range program to expand and improve the Grain Board's handling and storage system to increase the Grain Board's share of the domestic grain trade with the aim of increasing producer and lowering consumer prices. The total storage capacity provided by the project facilities would be 560,000 tons and would be provided through: A. (a) the construction and equipping of eleven terminal s

Project Information FAQ

Project Information

5 Q
The project “RECONSTRUCTION” is an infrastructure initiative in the Raw Materials sector, located in Iraq. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Part of a long-range program to expand and improve the Grain Board's handling and storage system to increase the Grain Board's share of the domestic grain trade with the aim of increasing producer and lowering consumer prices. The total storage capacity provided by the project facilities would be 560,000 tons and would be provided through: A. (a) the construction and equipping of eleven terminal silos, with a total capacity of about 468,000 tons; (b) the construction and equipping of three gathering silos, with a total capacity of 36,000 tons; (c) the construction and equipping of four silos expansions, with a total capacity of 36,000 tons; (d) the construction and equipping of a 20,000-ton transfer terminal silo at the port of Um Qasr. B. Provision of consulting services to: (i) assist in the design and construction supervision of the silos; (ii) provide technical assistance and equipment necessary to build mechanized inventory control and communications system; and (iii) undertake a comprehensive study on grain pricing and marketing. C. Provision for training for those who would manage and operate the new silo facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data