Red Bluff Road from Kirby Boulevard to State Highway 146
Sector: Bridge • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
The TxDOT Houston District is proposing improvements to Red Bluff Road from Kirby Boulevard to State Highway 146 in Seabrook, Harris County, Texas. The purpose of the proposed project is to improve safety and enhance mobility to accommodate existing and expected future growth. The existing roadway consists of approximately 1.5 miles of three 11-foot travel lanes with a continuous 11-foot left turn
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The TxDOT Houston District is proposing improvements to Red Bluff Road from Kirby Boulevard to State Highway 146 in Seabrook, Harris County, Texas. The purpose of the proposed project is to improve safety and enhance mobility to accommodate existing and expected future growth. The existing roadway consists of approximately 1.5 miles of three 11-foot travel lanes with a continuous 11-foot left turn lane between SH 146 and the Taylor Lake Bridge, and transitioning to one-way operation between the bridge and Kirby Boulevard. The existing bridge currently includes a two-lane, undivided roadway without pedestrian walkway facilities. The proposed improvements would construct two eastbound traffic lanes and convert the existing roadway to a one-way westbound operation. The proposed project would improve the roadway on the existing bridge over Taylor Lake to include the addition of a new bridge parallel to the existing bridge. This existing bridge, located north of the proposed new bridge, would be re-striped to two lanes of westbound traffic. The proposed new bridge would include two lanes of eastbound traffic and a 10-foot-wide pedestrian walkway. The proposed project’s letting date is December 2018. The total project length is 1.5 miles of roadway. The project requires 0.3 additional acre of right of way; however, no displacement to local residents is expected. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
