Red Cliff Transportation Facility
Sector: Car parking • Location: Bayfield, Wisconsin, United States of America
Source: Dodge USA
The Work consists of two (2) new buildings for The Red Cliff Band of Lake Superior Chippewa located along State Highway 13 as well as access and utility services to the new buildings and other Work indicated in the Contract Documents. The purpose of the two (2) buildings is to house equipment and offices for the Red Cliff Transportation Department. b. Building 1 Scope: One-story new transportation
- Status
- Under Construction
- Sector
- Car parking, Road, Commercial, Residential, Power Transmission, Automotive, Steel, Power Generation (CCGT)
- Location
- Bayfield, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Red Cliff Transportation Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of two (2) new buildings for The Red Cliff Band of Lake Superior Chippewa located along State Highway 13 as well as access and utility services to the new buildings and other Work indicated in the Contract Documents. The purpose of the two (2) buildings is to house equipment and offices for the Red Cliff Transportation Department. b. Building 1 Scope: One-story new transportation facility that will contain offices, maintenance operations, and tempered garages. Building 1 con... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Bayfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Commercial, Residential, Power Transmission, Automotive, Steel, Power Generation (CCGT) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
