Red Cliff West Water Main Loop
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge USA
Install 5900 lineal feet of Water Main and Appurtenances: Water main installation Trench installation 3870 lineal feet 8 PVC C900. Directional drilling, 105 lineal feet 8 HDPE under state highway, 1930 lineal feet of 8 HDPE under stream & wetlands. Appurtenances in accordance with AWWA Standard C605 including hydrants, valves, and other as required
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment
- Location
- Bayfield, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Red Cliff West Water Main Loop
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install 5900 lineal feet of Water Main and Appurtenances: Water main installation Trench installation 3870 lineal feet 8 PVC C900. Directional drilling, 105 lineal feet 8 HDPE under state highway, 1930 lineal feet of 8 HDPE under stream & wetlands. Appurtenances in accordance with AWWA Standard C605 including hydrants, valves, and other as required |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Bayfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
