Red Deer Flood Berms
Sector: Water Supply and Storage • Location: Alberta, Canada
Source: Infrastructure Canada
The Red Deer Flood Berms Project (the Project) includes design of the Civic Yards, and construction of the Wastewater Treatment Plant berm to raise the height, and thus improve climate resiliency at the sites. This will allow the sites to continue as a staging area for city crews as well as continue to treat wastewater at higher river flows.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Red Deer Flood Berms
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Red Deer Flood Berms Project (the Project) includes design of the Civic Yards, and construction of the Wastewater Treatment Plant berm to raise the height, and thus improve climate resiliency at the sites. This will allow the sites to continue as a staging area for city crews as well as continue to treat wastewater at higher river flows. |
Original sector | Climate Resilience |
Location
Country | Canada |
State | Alberta |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
