logo

Red Deer Riverside Meadows 2021 Repairs and Replacement

Sector: Mass Transit • Location: Alberta, Canada

Source: Infrastructure Canada

Project
Completed

The Red Deer Riverside Meadows 2021 Repairs and Replacement Project (the Project) will repair and replace park infrastructure in the Canadian Pacific Railway (CPR) Bridge Park in the City of Red Deer. Two picnic tables and a bench will be removed and an existing art bench installation will be relocated. Fencing will be installed along the south side of 58th Street from Taylor Drive to west of the

Project Information FAQ

Project Information

4 Q
The project “Red Deer Riverside Meadows 2021 Repairs and Replacement” is an infrastructure initiative in the Mass Transit sector, located in Alberta, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Red Deer Riverside Meadows 2021 Repairs and Replacement Project (the Project) will repair and replace park infrastructure in the Canadian Pacific Railway (CPR) Bridge Park in the City of Red Deer. Two picnic tables and a bench will be removed and an existing art bench installation will be relocated. Fencing will be installed along the south side of 58th Street from Taylor Drive to west of the Canadian Pacific Railway Bridge for crime prevention through environmental design. The Project also includes the installation of approximately two metres wide asphalted trail link connections and site grading, landscaping, and tree replacement at the following locations: • 57th Street from the existing multi-use trail running along the Red Deer River; • South side of 60th Street, starting at the sidewalk west of 60th Avenue, running west until the sidewalk east of Taylor Drive; • North-south, west of 60th Avenue linking up to the existing multi-use trail along Taylor Drive; • North side of Fairbank Road to link to the pedestrian bridge at Taylor Drive; and • North side of Kerry Wood Drive, linking a bus stop on Taylor Drive to the sidewalk on Fir Street.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data