Red Deer Westerner Storm Water Pond Reconstruction
Sector: Water Supply and Storage • Location: Alberta, Canada
Source: Infrastructure Canada
The Red Deer Westerner Storm Water Pond Reconstruction Project (the Project) will upgrade the Westerner Storm Pond, which acts as a treatment and flow equalization step for Westerner Exposition Grounds prior to discharge in Piper Creek. The project scope includes: draining the pond, removing the accumulated sand and silt in the pond, replacing the pipes that discharge to Piper Creek, increasing ca
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Red Deer Westerner Storm Water Pond Reconstruction Project (the Project) will upgrade the Westerner Storm Pond, which acts as a treatment and flow equalization step for Westerner Exposition Grounds prior to discharge in Piper Creek. The project scope includes: draining the pond, removing the accumulated sand and silt in the pond, replacing the pipes that discharge to Piper Creek, increasing capacity to have storage for a 1:100 year storm event, rebuilding the pond berm and increasing its elevation to prevent the creek from overflowing into the pond at a 1:100 year flood, installing an oil-grit separator to reduce sediment entering the pond and creek, installating a clay liner within the sand seams to mitigate hydrostatic pressures, and installating a beaver exclusion fence around the perimeter of the pond. The pond has been subject to significant siltation which has resulted in blockages in the outlet to Piper Creek which has caused localized flooding and discharge of silt to the creek. The main outcome of the Project will be improved stormwater retention, minimized localized flooding, and improved water quality in Piper Creek. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
