Red Head Road Ditching Phase 3

Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The Project consists of ditching a portion of Red Head Road. The scope includes ditching across from the park and redirecting stormwater. The project aims to prevent flooding in the area.

Status
Prospective
Sector
Water Supply and Storage, Road
Location
Newfoundland and Labrador, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Red Head Road Ditching Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Red Head Road Ditching Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of ditching a portion of Red Head Road. The scope includes ditching across from the park and redirecting stormwater. The project aims to prevent flooding in the area.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Newfoundland and Labrador

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road

Article published date

2026-03-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project