Red Lake Watermain Replacement
Completed · Ontario
Source: Infrastructure Canada
The project will rehabilitate watermains in Red Lake, Ontario. The work will replace 1,145 metres of watermain on Elliot Street East and nearby laneways, and include related collection systems and appurtenances. In addition, affected roadways and driveways will be returned to pre-construction condition. The project will fund improvements to local water pipes, which will increase access to potabl
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Red Lake Watermain Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will rehabilitate watermains in Red Lake, Ontario. The work will replace 1,145 metres of watermain on Elliot Street East and nearby laneways, and include related collection systems and appurtenances. In addition, affected roadways and driveways will be returned to pre-construction condition. The project will fund improvements to local water pipes, which will increase access to potable water by increasing the reliability and capacity of the transmission infrastructure. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
