Red Line Light Rail Transit (LRT) PPP project in Jerusalem
Financial close · Israel
Source: InfraPPPWorld
The Red Line is an LRT route which connects Mount Herzl, the Jerusalem City Centre and Pisgat Ze'ev. The Red Line is comprised of 13.8 km of tracks, includes 46 fully motorized 100% low floor vehicles, a depot and an OCC facility located at the French Hill. In addition, there are 23 stops along the Red Line route. To date, the Red Line serves more than 140,000 passengers on a regular day.The Red L
- Status
- Closed
- Sector
- Road, Rail, Automotive, Mass Transit, Government, Education, Hospital
- Location
- Israel
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Red Line Light Rail Transit (LRT) PPP project in Jerusalem
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | financial close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Red Line is an LRT route which connects Mount Herzl, the Jerusalem City Centre and Pisgat Ze'ev. The Red Line is comprised of 13.8 km of tracks, includes 46 fully motorized 100% low floor vehicles, a depot and an OCC facility located at the French Hill. In addition, there are 23 stops along the Red Line route. To date, the Red Line serves more than 140,000 passengers on a regular day.The Red Line Extensions intend to include the following additional routes:(i) The Neveh Yaakov route – 2 km of "at grade" tracks, from Pisgat Ze’ev (Kheil ha-Avir) to Neveh Ya'akov along dedicated routes at Moshe Dayan Blvd and Neveh Ya’akov Blvd, including 4 additional stops.(ii) The Hadassah route - 4.7 km of "at grade" tracks from Arthur Hantke, Henrietta Szold, on a dedicated track-way between Ora Junction and the entrance to the Hadassah hospital campus, and on the south and west parts of the Hadassah ring road, including 8 additional stops.(iii) The Givat Ram route - 1.1 km of "at grade" tracks from the central section of the Red Line intended to line the Hebrew University campus at Givat Ram, including 2 additional stops.The Red Line extensions are estimated to serve 60,000 additional passengers a day. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Israel |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Automotive, Mass Transit, Government, Education, Hospital |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Israel
- Kokhav Hayarden Hydro-Pumped Storage Station
- Ashdod Port - Southport Terminal
- Haifa Bay Port
- Hadera Desalination Plant - Extension
- Tactile Data Gathering Project
- Reducing the ecological footprint of ports with ECOncrete®’s bio-enhancing concrete technologies
- Pardes Heights
- Lessin Tower & Complex / MYS Architects
