Red River Floodway Expansion Project
Sector: Bridge • Location: World
Source: Water Technology
The Red River floodway was built to protect the city of Winnipeg from flooding. Image courtesy of Kmusser. A highway bridge and a railway bridge crossing the Red River floodway. The inlet control structure was upgraded as part of the floodway's expansion. Railway and highway bridges were elevated, replaced and upgraded. Red River Floodway, also known as Duff’s Ditch, is a 48km artificial flood con
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Red River floodway was built to protect the city of Winnipeg from flooding. Image courtesy of Kmusser. A highway bridge and a railway bridge crossing the Red River floodway. The inlet control structure was upgraded as part of the floodway's expansion. Railway and highway bridges were elevated, replaced and upgraded. Red River Floodway, also known as Duff’s Ditch, is a 48km artificial flood control waterway, which was built between 1962 and1968 in Canada. It was built after a major flood in 1950 inflicted heavy damage upon the city of Winnipeg. The floodway enables the flood water from the Red River to divert water around the city of Winnipeg before re-entering the Red River. Expansion works began in 2005 after the existing floodway with its one in 100-year floodwater containment system reached its maximum capacity in 1997. The Red River floodway expansion project included the widening of the whole channel, improvements to the railway and highway bridges, upgrade and construction of the inlet and outlet control structures and extension of the west dike. The $627m expansion was funded by the Canadian Government and the Province of Manitoba. Construction was expected to be completed in 2010, but was delayed. The project was finally completed at $38m, below the initially estimated budget of $665m in March 2014.The project is hailed as one of the world’s engineering marvels, on par with the Eiffel Tower, the Panama Canal and the Channel Tower recognised by the International Association of Macro Engineering Societies (IAMES). The history of the artificial floodway at Winnipeg dates back to the year 1962 when the construction work began. The motive behind the construction of the floodway was to avoid disasters such as the flooding of Winnipeg in 1826, which is the largest flood on record in the history of the city. Construction work on the floodway began in October 1962 and was completed in March 1968 at a cost of $63m. It involved about 76.5 million cubic metres of earth works. The flood of the century in 1997 led the International Joint Commission (IJC) to review flood protection measures in Winnipeg, the outcome of which led to the measures initiated to avoid devastation from flooding. The proposal to expand the existing floodway was brought up with the first construction work starting in 2005. The Red River Floodway had an initial capacity of 1,700m³ (60,000ft³) a second of one in 100-year flow protection. The expansion project increased it to 4,000m³ a second of one in 700-year protection. The expansion helps in preventing more than $12bn in damages from expected flooding and continues to protect 450,000 Manitobans living in the areas of Winnipeg, East St. Paul and West St. Paul. The expansion was executed in five stages, with the initial widening of the channel. The channel was widened from 35m to 85m to avoid its deepening, which could have repercussions on the groundwater in the neighbouring areas. The inlet control structure was enhanced with fire prevention and erosion protection works. The hydraulic, mechanical and electrical machines were also upgraded. Two hydraulic petroleum cylinders were replaced with containers containing vegetable oil.The outlet control structure was also expanded to twice its size, adding erosion protection measures and building baffle blocks to reduce the speed of water. Railway and highway bridges were elevated, replaced and upgraded. Improvements were made for some bridges and drainage structures and crossings such as the city of Winnipeg aqueducts and the Seine River siphon were modified. The West Dike was extended to 11km and raised up to 1.5m to protect the city against wind and waves for 100 years. Ditch grading, culverts and rock rip-rap were installed to check erosion. The entire expansion involved 21 million cubic metres of earthworks. Management and maintenance of the Red River floodway expansion project was undertaken by Manitoba Floodway Authority (MFA). More than 170 companies and 3,600 workers were involved in the project. MMM Group was responsible for the replacement and upgrading of the six railway bridges crossing the floodway. The contract for constructing the highway bridge girders was awarded to Lafarge Canada for $20.9m, while Barkman Concrete constructed the highway detour barriers for $400,000. A joint venture of Strilkiwski Contracting and Nelson House Forest Industries constructed the PTH59 South Detour. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
