Red Rock Water Pollution Control Plant

Sector: Geothermal • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The Project entails construction of a new Water Pollution Control Plant (WPCP) to provide secondary (enhanced) level treatment of wastewater with some components of tertiary treatment, replacing the existing facility which provides primary level treatment only. The Project scope will include decommissioning and demolition of the existing primary treatment plant and outfall pipe as well as the foll

Status
Closed
Sector
Geothermal, Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial, Cement
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Red Rock Water Pollution Control Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Red Rock Water Pollution Control Plant” is an infrastructure initiative in the Geothermal sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project entails construction of a new Water Pollution Control Plant (WPCP) to provide secondary (enhanced) level treatment of wastewater with some components of tertiary treatment, replacing the existing facility which provides primary level treatment only. The Project scope will include decommissioning and demolition of the existing primary treatment plant and outfall pipe as well as the following planned capital works and construction elements of the new water pollution control plant: •Construction of a new administrative and process building structure which includes a headworks area for screening and grit removal, an area for chemical storage tanks and chemical feed systems, a Motor Control Center (MCC) room, an administrative area, a basement area to house pumps and blowers, ultraviolet (UV) effluent disinfection area, and a submersible type sewage pumping station. •Supply and Installation of process equipment and components including primary and secondary clarifiers, biological treatment unit featuring Rotating Biological Contactors (RBC), cloth disk filters, bio-solids aerobic digester, storage tanks for phosphorous removal & alkalinity dosing system, effluent water pumps, sludge pumps and chambers at various stages of treatment system. •Mechanical works including process piping, process valves, HVAC, ductwork and accessories, and mechanical insulation. •Electrical works, including backup diesel generator, MCC panels, electrical ducts, transfer switch, cables, wires and conduits. •Process Control and Instrumentation including Supervisory Control and Data Acquisition (SCADA), automated effluent sampler, metering/transmitters/analyzers devices for monitoring and control of flow, pressure, level, and other process parameters as required. •General works, including concrete, masonry, metals, wood and plastics, thermal and moisture protection, and doors and windows. •Various site works including, but not limited to, demolition, process tank cleanout, dewatering

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Geothermal, Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial, Cement

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project