Redbank Power Station Biomass Conversion
Sector: Biomass • Location: Maitland/Muswellbrook, New South Wales, Australia
Source: RenewEconomy
The project involves refitting the shuttered Redbank coal-fired power station to burn waste wood biomass instead of coal. The plant will have a rated capacity of up to 151 MW and will operate 24/7, burning 700,000 dry tonnes of biomass annually. The project aims to count as zero emissions under Australian rules by using biomass that would otherwise rot on the ground.
- Status
- Prospective
- Sector
- Biomass, Power Generation (CCGT)
- Location
- Maitland/Muswellbrook, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Redbank Power Station Biomass Conversion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves refitting the shuttered Redbank coal-fired power station to burn waste wood biomass instead of coal. The plant will have a rated capacity of up to 151 MW and will operate 24/7, burning 700,000 dry tonnes of biomass annually. The project aims to count as zero emissions under Australian rules by using biomass that would otherwise rot on the ground. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | New South Wales |
City | Maitland/Muswellbrook |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Biomass, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in Australia
- Callide CoalFired Power Stations Queensland
- SAB Miller Brewery, New South Wales
- VISY Clean Energy Project
- Australian Biomass for Bioenergy Assessment 2015-2021
- Generation 2 Ethanol from Sugarcane Waste
- Future Proofing in Australia's Electricity Distribution Industry
- Advanced Biomass Gasification Technology
- Bioenergy Australia Participation in the IEA TCP on Bioenergy
