Redbank Power Station Biomass Restart Project
Sector: Raw Materials • Location: Warkworth, New South Wales, Australia
Source: RenewEconomy
A proposal by Verdant Earth Technologies to restart the shuttered 151 MW Redbank Power Station at Warkworth, NSW, to burn biomass mostly from waste wood, including invasive native species and plantation crops, providing baseload power for the grid.
- Status
- Failure
- Sector
- Raw Materials, Biomass, Power Generation (CCGT)
- Location
- Warkworth, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Redbank Power Station Biomass Restart Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | rejected |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposal by Verdant Earth Technologies to restart the shuttered 151 MW Redbank Power Station at Warkworth, NSW, to burn biomass mostly from waste wood, including invasive native species and plantation crops, providing baseload power for the grid. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | New South Wales |
City | Warkworth |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Biomass, Power Generation (CCGT) |
Article published date | 2025-09-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
