logo

Redbank Power Station Biomass Restart Project

Sector: Raw Materials • Location: Warkworth, New South Wales, Australia

Source: RenewEconomy

Project
Rejected

A proposal by Verdant Earth Technologies to restart the shuttered 151 MW Redbank Power Station at Warkworth, NSW, to burn biomass mostly from waste wood, including invasive native species and plantation crops, providing baseload power for the grid.

Status
Failure
Sector
Raw Materials, Biomass, Power Generation (CCGT)
Location
Warkworth, New South Wales, Australia
Updated
22 Jul 2026
Source
RenewEconomy

ConstructChat

Ask ConstructChat about Redbank Power Station Biomass Restart Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Redbank Power Station Biomass Restart Project” is an infrastructure initiative in the Raw Materials sector, located in Warkworth, New South Wales, Australia. Taiyo aggregates data on it from RenewEconomy.

Participants

Not available for this record.

Status

Original status

rejected

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposal by Verdant Earth Technologies to restart the shuttered 151 MW Redbank Power Station at Warkworth, NSW, to burn biomass mostly from waste wood, including invasive native species and plantation crops, providing baseload power for the grid.

Original sector

Energy

Budget

Location

Country

Australia

State

New South Wales

City

Warkworth

Source

Source

RenewEconomy

URL

More Details

Record type

Project

Sector

Raw Materials, Biomass, Power Generation (CCGT)

Article published date

2025-09-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project