Redd Dewatering II
Archived · United States of America
Source: Grants.gov
The Central Valley Project Improvement Act (CVPIA: Title 34 of Public Law 102-575, Section 3406 (b)(1)) authorizes and directs the Secretary of the DOI, in consultation with other State and Federal agencies, Indian tribes, and affected interests to develop and implement a program which makes all reasonable efforts to at least double natural production of anadromous fish in Central Valley rivers an
- Status
- Closed
- Sector
- Hydro, Government, Manufacturing (Industrial), Water Supply and Storage
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Redd Dewatering II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Central Valley Project Improvement Act (CVPIA: Title 34 of Public Law 102-575, Section 3406 (b)(1)) authorizes and directs the Secretary of the DOI, in consultation with other State and Federal agencies, Indian tribes, and affected interests to develop and implement a program which makes all reasonable efforts to at least double natural production of anadromous fish in Central Valley rivers and streams. The Pacific States Marine Fisheries Commission (PSMFC) is uniquely qualified to do the data collection necessary for the Pilot Redd Dewatering Project as they are able to attain qualified staff who can work in a compatible manner with both cooperating agencies. The PSMFC staff will have the qualifications for data collection, boat safety, wading safety, mapping and use of GPS in addition to being familiar with the area that the work will occur. This project is to collect data to help us to understand at what flow conditions fall Chinook salmon redds are dewatered. The geographic area of concern is the mainstem Sacramento River from Keswick Dam to Red Bluff. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Hydro, Government, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
