logo
ProjectAwarded

Redevelopment 2.0 Likembe Subsea Tie-Back Project

The owner, status and timeline of this project. A free account opens every field.

Source: Offshore Engineer Magazine

Subsea7 has been awarded an engineering, procurement, construction and installation (EPCI) contract by ExxonMobil for a subsea tie-back project offshore Angola in Block 15. The project involves integrated development solutions and aims to support local capabilities in Angola.

Status
Closed
Sector
Oil and Gas
Location
Luanda, Angola
Updated
22 Jul 2026
Source
Offshore Engineer Magazine

ConstructChat

Ask ConstructChat about Redevelopment 2.0 Likembe Subsea Tie-Back Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Redevelopment 2.0 Likembe Subsea Tie-Back Project” is an infrastructure initiative in the Oil and Gas sector, located in Luanda, Angola. Taiyo aggregates data on it from Offshore Engineer Magazine.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Subsea7 has been awarded an engineering, procurement, construction and installation (EPCI) contract by ExxonMobil for a subsea tie-back project offshore Angola in Block 15. The project involves integrated development solutions and aims to support local capabilities in Angola.

Original sector

Oil and Gas

Budget

Location

Country

Angola

City

Luanda

Source

Source

Offshore Engineer Magazine

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project