Redondo Fishing Pier Replacement
Sector: Raw Materials • Location: Des Moines, Washington, United States of America
Source: Dodge
This Contract provides for the improvement of City of Des Moines Redondo Fishing Pier Replacement. Work includes removing existing fishing pier, disposal of existing creosote treated timber, removing concrete curb and sidewalk and asphalt concrete pavement, constructing a new fishing pier, turbidity curtain, HMA Paving, slurry seal, paint line, illumination system, traffic control, cement concrete
- Status
- Closed
- Sector
- Raw Materials, Road, Forest Products and Packaging, Car parking, Automotive, Commercial, Cement, Government
- Location
- Des Moines, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Redondo Fishing Pier Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Contract provides for the improvement of City of Des Moines Redondo Fishing Pier Replacement. Work includes removing existing fishing pier, disposal of existing creosote treated timber, removing concrete curb and sidewalk and asphalt concrete pavement, constructing a new fishing pier, turbidity curtain, HMA Paving, slurry seal, paint line, illumination system, traffic control, cement concrete sidewalk, cement concrete traffic curb and gutter, cement concrete pedestrian curb, trash recept... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Des Moines |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Road, Forest Products and Packaging, Car parking, Automotive, Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
