logo

RedRiver Electrical Distribution & Selenoid Valve REBID

Sector: Water Supply and Storage • Location: Elk City, Idaho, United States of America

Source: Dodge USA

Project
Bidding

Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipme

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial
Location
Elk City, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RedRiver Electrical Distribution & Selenoid Valve REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RedRiver Electrical Distribution & Selenoid Valve REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Elk City, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipment and providing all labor in the general trades of work: site work, excavation, trenching and ba...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Elk City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project