logo

Redstone Concentrated Solar Thermal Power (CSP) plant

Sector: Geothermal • Location: South Africa

Source: World Bank Group

Project
Active

The project involves the development, construction and operation of the 100MW Redstone concentrated solar thermal power (CSP) plant, located in the Hay District, 30 km from Postmasburg in the Northern Cape province, South Africa. The project is part of the South African Renewable Energy Independent Power Producer (REIPP) Procurement Program. The produced energy will be sold to the South African st

Status
Prospective
Sector
Geothermal, Manufacturing (Industrial), Power Transmission, Solar, Power Generation (CCGT), Commercial, Government
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Redstone Concentrated Solar Thermal Power (CSP) plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Redstone Concentrated Solar Thermal Power (CSP) plant” is an infrastructure initiative in the Geothermal sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development, construction and operation of the 100MW Redstone concentrated solar thermal power (CSP) plant, located in the Hay District, 30 km from Postmasburg in the Northern Cape province, South Africa. The project is part of the South African Renewable Energy Independent Power Producer (REIPP) Procurement Program. The produced energy will be sold to the South African state-utility Eskom under a 20 year PPA.The SPV is Solarreserve Redstone Solar Thermal Power Plant (Pty) Ltd, owned 50% by ACWA Power, Aventro, CEF, KDI, Pele Green and a local community trust. The total project cost is around $ 826.3 million. Of the total debt package of $ 698.92 million, provided by FMO , African Development Bank, DEG, Industrial Development Corporation of South Africa, ABSA Bank, Development Bank of Southern Africa, Investec, CDC Group, ICBC and Sanlam. Financial close was announced on May 10, 2021. The EPC contractor is Northwinds Trading (Pty) Ltd https://ijglobal.com/articles/155195/redstone-csp-reaches-financial-close

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Manufacturing (Industrial), Power Transmission, Solar, Power Generation (CCGT), Commercial, Government

Article published date

2024-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project