logo

Redwood Curb Replacement Program

Sector: Waste Processing and Treatment • Location: Stockton, California, United States of America

Source: Dodge USA

Project
Pre-Design

Replace redwood curbs at 45 locations citywide. This will replace deteriorating redwood curbs and improve roadway drainage.

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
Location
Stockton, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Redwood Curb Replacement Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Redwood Curb Replacement Program” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Stockton, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace redwood curbs at 45 locations citywide. This will replace deteriorating redwood curbs and improve roadway drainage.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Stockton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Government, Commercial

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project