Reese Park Pavilion
Sector: Government • Location: Muskegon, Michigan, United States of America
Source: Dodge USA
construct an outdoor pavilion within Reese Park, 1685 Creston St, Muskegon. Pavilion requirements are as follows: Minimum 800 SFT of floor space Minimum 8 FT vertical clearance Minimum 10 FT clearance between posts Timber Frame construction 4 concrete slab extending 1 FT beyond drip line on all sides 20A GFCI Electrical Outlets on four (4) of the posts Corrugated steel roofing Site Grading
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | construct an outdoor pavilion within Reese Park, 1685 Creston St, Muskegon. Pavilion requirements are as follows: Minimum 800 SFT of floor space Minimum 8 FT vertical clearance Minimum 10 FT clearance between posts Timber Frame construction 4 concrete slab extending 1 FT beyond drip line on all sides 20A GFCI Electrical Outlets on four (4) of the posts Corrugated steel roofing Site Grading |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
