Reeves Creek Mitigation Site Improvements Route 4
Sector: Water Supply and Storage • Location: Stockbridge, Georgia, United States of America
Source: Dodge USA
- Route 4 would begin at a lift station located on the east side of Flippen Road. A new lift station would pump sanitary sewer through a force main until it reaches the existing gravity sewer that goes through the Reeves Creek Mitigation Site. The existing 8-inch gravity sewer line would have to be upsized to manage flow volume to a 24-inch line with gravity flow to the existing 24- inch intercept
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial
- Location
- Stockbridge, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reeves Creek Mitigation Site Improvements Route 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | - Route 4 would begin at a lift station located on the east side of Flippen Road. A new lift station would pump sanitary sewer through a force main until it reaches the existing gravity sewer that goes through the Reeves Creek Mitigation Site. The existing 8-inch gravity sewer line would have to be upsized to manage flow volume to a 24-inch line with gravity flow to the existing 24- inch interceptor terminus, and then the sanitary sewer would flow by gravity through the upsized main. Other co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Stockbridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
