REFINERY ENERGY CONS
Sector: Rail • Location: Pakistan
Source: World Bank Group
The Refinery Energy Conservation and Modernization Project aims to reduce refinery energy consumption; increase crude processing capacity; modify National Refinery Ltd.'s (NRL) refinery output mix to better match demand; and to strengthen production optimization and control systems and train staff. Further, the project aims to promote a refinery pricing system that will provide adequate incentive
- Status
- Closed
- Sector
- Rail, Power Generation (CCGT), Oil and Gas, Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about REFINERY ENERGY CONS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Refinery Energy Conservation and Modernization Project aims to reduce refinery energy consumption; increase crude processing capacity; modify National Refinery Ltd.'s (NRL) refinery output mix to better match demand; and to strengthen production optimization and control systems and train staff. Further, the project aims to promote a refinery pricing system that will provide adequate incentives for efficiency improvements, and assist Government in formulating an optimal investment program for the refinery sector as a whole. With this in mind, the project includes (i) balancing and modernization of the crude processing unit; (ii) a captive power plant; (iii) debottlenecking of the hydo-treater and platformer; and (iv) process modifications to lube unit I. In addition, the project supports (v) efficiency improvement measures; and (vi) studies, training, technical assistance, research and development. These measures, identified under the previous refinery engineering project, will yield significant benefits at relatively low incremental cost, by modifying existing process units and adding ancilliary facilities. |
Original sector | Energy and Extractives |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Rail, Power Generation (CCGT), Oil and Gas, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
