logo

Reflection Bay Water Reclamation Facility 2 MGD to 6 MGD Expansion and Rehabilitation, TX

Sector: Chemical (Industrial) • Location: Texas, United States of America

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Reflection Bay Water Reclamation Facility 2 MGD to 6 MGD Expansion and Rehabilitation, TX Pearland, Texas 2019 completion $44.7M Value PLW Waterworks is expanding the Reflection Bay Water Reclamation Facility in Pearland, Texas from 2 million gallons of surface water a day (MGD) to 6 MGD. The scope of this project includes construction of a new headworks with tw

Project Information FAQ

Project Information

5 Q
The project “Reflection Bay Water Reclamation Facility 2 MGD to 6 MGD Expansion and Rehabilitation, TX” is an infrastructure initiative in the Chemical (Industrial) sector, located in Texas, United States of America. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Reflection Bay Water Reclamation Facility 2 MGD to 6 MGD Expansion and Rehabilitation, TX Pearland, Texas 2019 completion $44.7M Value PLW Waterworks is expanding the Reflection Bay Water Reclamation Facility in Pearland, Texas from 2 million gallons of surface water a day (MGD) to 6 MGD. The scope of this project includes construction of a new headworks with two mechanically cleaned bar screens, four new SBR basins to increase capacity and convert to continuous flow SBR technology, a blower and electrical building to house magnetic bearing turbo SBR blowers and switchgear and controls for the SBR headworks equipment. The team will also add two tertiary filter basins, new non-portable water transfer pumps, storage tank, and distribution pumps, as well as chlorine disinfection equipment for the NPW system. A new chemical feed and an electrical building will house chemical feed equipment for the NPW system and electrical switchgear and controls for the NPW system.  In addition to the new construction, PLW will install two new three-belt dewatering belt presses and associated belt press feed pumps, sludge grinders, package polymer systems, and loadout sludge conveyors, four new positive displacement blowers for the aerated sludge holding tanks in the existing dewatering building,  new associated interconnecting yard piping, a new standby generator, plant-wide instrumentation and supervisory control and data acquisition (SCADA) infrastructure, and finally paving and drainage improvements. Modifications to the existing lift station will be made to increase capacity, improve mixing, and control odor emissions. PLW Waterworks will change the current sequencing batch reactors (SBRs), amend the existing aerated sludge holding tanks and build two new aerated slurry holding tanks to increase the sludge storage capacity and improve the flexibility of the overall facility operation. This project received the Engineering News Record Award of Merit (Water/Environment) for 2019.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data