logo
ProjectPlanned

Reform Solar Project

Sector: Solar • Location: Fulton, Missouri, United States

Source: KOMU 8

Ameren Missouri proposes to build a 250-megawatt solar generation facility and a new 345-kilovolt switching station called the Odyssey Switching Station at the Callaway Energy Center in Callaway County. The project aims to provide renewable energy credits to the region and take advantage of federal tax credits.

Status
Prospective
Sector
Solar, Power Generation (CCGT)
Location
Fulton, Missouri, United States of America
Updated
22 Jul 2026
Source
KOMU 8

ConstructChat

Ask ConstructChat about Reform Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Reform Solar Project” is an infrastructure initiative in the Solar sector, located in Fulton, Missouri, United States. Taiyo aggregates data on it from KOMU 8.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ameren Missouri proposes to build a 250-megawatt solar generation facility and a new 345-kilovolt switching station called the Odyssey Switching Station at the Callaway Energy Center in Callaway County. The project aims to provide renewable energy credits to the region and take advantage of federal tax credits.

Original sector

Energy

Location

Country

United States of America (USA)

State

Missouri

City

Fulton

Source

Source

KOMU 8

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project