logo

Refugio Road Undercrossing Bridges Replacement Project

Sector: Cement • Location: Refugio, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Proposed

Caltrans proposes to replace the northbound and southbound bridges at Refugio Road along U.S. 101 near Refugio State Beach (post miles R36/R37). The new concrete bridges would have about the same alignment, profile, and lane configuration as the existing bridges, but would be 7 feet wider to accommodate standard 10-foot shoulders. Two build alternatives were considered, and the clear-span bridges

Project Information FAQ

Project Information

5 Q
The project “Refugio Road Undercrossing Bridges Replacement Project” is an infrastructure initiative in the Cement sector, located in Refugio, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Caltrans proposes to replace the northbound and southbound bridges at Refugio Road along U.S. 101 near Refugio State Beach (post miles R36/R37). The new concrete bridges would have about the same alignment, profile, and lane configuration as the existing bridges, but would be 7 feet wider to accommodate standard 10-foot shoulders. Two build alternatives were considered, and the clear-span bridges have been identified as the preferred alternative: Two-span replacement bridges. Each bridge would have a center support column, resembling the existing bridges. Clear-span replacement bridges (preferred alternative). The new bridges would not require a center support column but would appear thicker (increased depth) than the existing bridges and have larger abutments to support the longer and heavier bridge span. Both build alternatives would also remove a partial fish passage barrier caused by the existing concrete-grouted rock slope protection lining in Cañada del Refugio Creek. The rock slope protection would be removed from the creek bed and naturalized with gravel and stone, and the riparian corridor would be replanted with trees and other riparian plants. Other project elements include upgrading bridge rails on the northbound U.S. 101 on-ramp bridge, rehabilitating the existing pedestrian pathway beneath the bridges, and updating the lighting system through the project limits.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data