Refurbishing of subway system infrastructures (Infrastructure Renovation Project - Phase II)
Sector: Waste Processing and Treatment • Location: Quebec, Canada
Source: Infrastructure Canada
Phase 2 of the Réno-Infrastructures project is a continuation of phase 1. It involves the replacement or rehabilitation of metro infrastructures at the end of their service life and optimizes investments by using them as a lever to improve customer service and the Société de transport de Montréal (STM’s) financial and operational performance. The work will be carried out in such a way as to minimi
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Mass Transit, Tunnel
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Refurbishing of subway system infrastructures (Infrastructure Renovation Project - Phase II)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 2 of the Réno-Infrastructures project is a continuation of phase 1. It involves the replacement or rehabilitation of metro infrastructures at the end of their service life and optimizes investments by using them as a lever to improve customer service and the Société de transport de Montréal (STM’s) financial and operational performance. The work will be carried out in such a way as to minimize passenger inconvenience. Generally speaking, the repairs included in the Réno-Infrastructure project involve: - Components in different stations (lighting, power distribution systems of 600 V or less, architectural finishes, mechanical components, entrances, membranes, etc.); - Auxiliary structures (electrical, mechanical and structural components); - Tunnel sections (vault, walls, invert and drain under the invert); - Garages and shops; - The restoration of several works of art; and - Injection work to correct recurring infiltrations at various locations (stations, tunnels and auxiliary structures). The deliverables specifically included in the part of the project to be financed by Public Transit Infrastructure Fund (PTIF) are as follows: butterfly doors and door frames; Beaudry - Repairs to the station; Atwater - Repairs to the Cabot Square entrance; Viau station - Reroofing; Station lighting; Tunnel Vault (L4 tail tracks) and repair of two auxiliary structures; tunnel Vault (L1-L2-L4 connecting track); Edouard Montpetit, Acadie, De Castelnau, Fabre - repairs to downspouts; repairs to the sanitary sewer - various stations; Côte-Vertu - repairs to the station; and various leases required during the work. |
Original sector | Public Transit |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Mass Transit, Tunnel |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
