Regional Electricity Access and BEST Project
Sector: Energy Storage • Location: Western and Central Africa
Source: World Bank Group
The development objective of the Regional Electricity Access and Battery Energy Storage Technology (BEST) Project for Cote d’Ivoire, Mali, Mauritania, Niger, Senegal, and the Economic Community of West African States (ECOWAS) is to increase access to grid electricity, enhance power system stability, and increase renewable energy integration in the West Africa power pool (WAPP). The project compris
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the Regional Electricity Access and Battery Energy Storage Technology (BEST) Project for Cote d’Ivoire, Mali, Mauritania, Niger, Senegal, and the Economic Community of West African States (ECOWAS) is to increase access to grid electricity, enhance power system stability, and increase renewable energy integration in the West Africa power pool (WAPP). The project comprises of four components. The first component, design, supply, and installation of electricity distribution infrastructure specifically supports the detailed design, supply, and installation of distribution networks from the WAPP 225/33-kV substations. The second component, design, supply, and installation of battery energy storage technology (BEST) equipment involves the supply and installation of a 205-MWh BEST to provide frequency control to the WAPP power system. The third component, supervision of the construction and technical advisory will finance the costs associated with the recruitment of the two owner’s engineers who will be recruited on a competitive basis under the project to supervise the work carried out under component 1 and component 2. The fourth component, project coordination and technical assistance will finance a combination of technical assistance and project management support to assist Recipients in successfully implementing the project and preparing for future energy access phases under the program. It consists of following sub-components: (i) regional implementation support; and (ii) national implementation support. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
