REGIONAL HYDROPOWER DEVELOPMENT PROJECT
Closed · Mauritania
Source: World Bank Group
The Regional Hydropower Development Project's main objectives are to: (i) reduce the long-term cost of electricity supply to the 3 countries; (ii) contribute to meeting debt service associated with the building of the Manantali dam; (iii) contribute to increasing the efficiency and reliability of power systems; (iv) establish an effective organization to construct and operate the project facilitie
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Commercial, Raw Materials, Government
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about REGIONAL HYDROPOWER DEVELOPMENT PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Regional Hydropower Development Project's main objectives are to: (i) reduce the long-term cost of electricity supply to the 3 countries; (ii) contribute to meeting debt service associated with the building of the Manantali dam; (iii) contribute to increasing the efficiency and reliability of power systems; (iv) establish an effective organization to construct and operate the project facilities and to mitigate environment and health impacts of the projects and the Manantali dam; (v) promote competitive private sector participation; and (vi) support the traditional agricultural sector downstream through the rational management of the Manantali reservoir. The project's components are as follows: 1) power station including civil works, electromechanical equipment, step-up substation, and reinforcement works; 2) transmission system comprising transmission lines and a dispatching center; 3) construction supervision; 4) institutional strengthening including studies, training, procurement of equipment and other support; and 5) Project Preparation Facility Advance refinancing. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Mauritania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Commercial, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
