Regional Integrated Loop Phase 2C Improvements
Sector: Water Supply and Storage • Location: Arcadia, Florida, United States of America
Source: Dodge USA
The Regional Integrated Loop Phase 2C Interconnect is comprised of about 19-miles of 36 "- to 42" diameter pipeline beginning at the terminus of the Phase 2B Pipeline and extending generally west and north through Sarasota County and terminating at the Sarasota County Carlton Water Treatment Plant. The project includes a ground storage tank and booster pumping station and crossings of I-75 and the
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Arcadia, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Regional Integrated Loop Phase 2C Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Regional Integrated Loop Phase 2C Interconnect is comprised of about 19-miles of 36 "- to 42" diameter pipeline beginning at the terminus of the Phase 2B Pipeline and extending generally west and north through Sarasota County and terminating at the Sarasota County Carlton Water Treatment Plant. The project includes a ground storage tank and booster pumping station and crossings of I-75 and the Myakka River in the northern end of the pipeline. The Phase 2C pipeline completes a plant-to-pla... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Arcadia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
