Regional Integrated Loop Phase 3C Extension
Sector: Water Supply and Storage • Location: Southeast Arcadia, Florida, United States of America
Source: Dodge USA
The Phase 3C Extension Regional Integrated Loop project will consist of approximately 10.8 miles of 36" or 42" diameter water main installed between Phase 3C in the vicinity of Fruitville Road (780) westward under I-75, south of Benderson/UTC Mall area and then northwest to an existing facility at Lockwood Ridge Rd & University Pkwy. A new storage and pumping facility near Fruitville Rd and Lorain
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Education, Raw Materials, Chemical (Industrial), Commercial, Road, Manufacturing (Industrial), Government
- Location
- Southeast Arcadia, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Regional Integrated Loop Phase 3C Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Phase 3C Extension Regional Integrated Loop project will consist of approximately 10.8 miles of 36" or 42" diameter water main installed between Phase 3C in the vicinity of Fruitville Road (780) westward under I-75, south of Benderson/UTC Mall area and then northwest to an existing facility at Lockwood Ridge Rd & University Pkwy. A new storage and pumping facility near Fruitville Rd and Lorainne Rd. will be capable of sending flows both north and south with chemical trim facilities . Some... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Southeast Arcadia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Education, Raw Materials, Chemical (Industrial), Commercial, Road, Manufacturing (Industrial), Government |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
