logo
ProjectActive

Regional load distribution centers for power grid stability

The status, timeline and source of this project. A free account opens every field.

Source: KFW Bank aus Verantwortung

The proposed project envisages the construction and digital equipment of three regional load distribution centers in Abidjan, Bouaké and Man. This will enable the state-owned energy company Côte d'Ivoire Énergies (CI-ENERGIES) to efficiently control and monitor the network and increase the ability to react to network disruptions at a regional level. Reliable data collection and transmission will b

Status
Prospective
Sector
Broadband, Power Generation (CCGT), Telecommunications, Geothermal, Forest Products and Packaging, Government
Location
Cote d'Ivoire
Updated
19 Nov 2026
Source
KFW Bank aus Verantwortung

ConstructChat

Ask ConstructChat about Regional load distribution centers for power grid stability

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Regional load distribution centers for power grid stability” is an infrastructure initiative in the Broadband sector, located in Cote d'Ivoire. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed project envisages the construction and digital equipment of three regional load distribution centers in Abidjan, Bouaké and Man. This will enable the state-owned energy company Côte d'Ivoire Énergies (CI-ENERGIES) to efficiently control and monitor the network and increase the ability to react to network disruptions at a regional level. Reliable data collection and transmission will be ensured as part of the project by expanding missing fiber optic cables on existing lines and digitally connecting the switchgear. Fiber optic cables allow large amounts of data to be transmitted at the speed of light so that any disruptions in network operation can be identified quickly enough and forwarded to the load distribution centers, which can respond to the instability in the network. The improved network control also ensures that power plants can produce more evenly and thus reduce the wear and tear on the switching devices, which leads to increased efficiency and thus savings in greenhouse gas emissions. The improved power supply and the avoidance of unnecessary power outages ultimately benefit the people of Côte d'Ivoire. An improved investment climate in the country ensures productivity gains and creates new employment opportunities in the private sector. This protects against supply shortages and income losses and promotes social and economic development in the country in the long term.

Budget

Location

Country

Cote d'Ivoire

Source

Source

KFW Bank aus Verantwortung

URL

More Details

Record type

Project

Sector

Broadband, Power Generation (CCGT), Telecommunications, Geothermal, Forest Products and Packaging, Government

Article published date

2024-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project