Regional Rusumo Falls Hydroelectric Project (RRFHP) Development Objective is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi. It Comprises of construction of an 80 MW power plant including the associated generation substation. The project is jointly financed by  the Governments of Rwanda, Burundi and Tanzania with credits and grants totaling to USD 340 

Project Information FAQ

Project Information

5 Q
The project “Regional Rusumo Falls Hydroelectric Power Project II” is an infrastructure initiative in the Government sector, located in Burundi. Taiyo aggregates data on it from Programme for Infrastructure Development in Africa (PIDA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Regional Rusumo Falls Hydroelectric Project (RRFHP) Development Objective is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi. It Comprises of construction of an 80 MW power plant including the associated generation substation. The project is jointly financed by  the Governments of Rwanda, Burundi and Tanzania with credits and grants totaling to USD 340  million equivalent for the Civil Works and Electromechanical Works. AfDB parallel-financing is associated with the transmission lines to each of the three countries at a cost of USD 121 Million.  These include 220kV transmission lines double circuit running 161 km from the power plant to Gitega substation in Burundi, 119km double circuit line from the Power plant to Shango sub-station in Rwanda and 98.2 km double circuit line from the power plant to Nyakanazi sub-station in Tanzania.The project has the following components CP1 (Civil Works); CP2 (Electromechanical works); Livelihoods Restoration Program (LRP); and Local Area Development Program (LADP). Out of the USD 340 million, the budget breakdown for each of the component is as follows: (i)LADP allocation is USD 15 million (USD 5 million for each country (Burundi, Rwanda and Tanzania); (ii)LRP allocation is about USD 711,612 (only for PAPs); and (iii)The remaining is for CP1, CP2, OE, and PIU operations.The three governments mandated and entrusted Nile Basin Initiative /Nile Equatorial lakes Subsidiary Action Program Coordination Unit (NBI/NELSAP CU) to coordinate the implementation of the project. The Nile Basin Trust Fund (NBTF) financed the Feasibility and Design Studies to a tune of USD 7.72 million. The studies were carried out from 2005 and completed in 2013. The studies were undertaken by NBI/NELSAP CU. The Project was approved by the World Bank in 2014; procurement of CP1 Contractor and CP2 Contractor was started in 2015 and completed and Contracts signed on 9th November, 2016; mobilization for construction works started in December 2016/January 2017; and the project completion date is 2021.  

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data